Design and construction began in 2017 of an 811 spaces parking deck to serve the Complexe 4 Glaces (C4G). The building offers a safe route to the complex for users, efficient circulation allowed by the width of the traffic lanes and the enlarged parking spaces and optimizes the periods of affluence during the holding of sports events. The volumetry of the parking lot is simple, functional and efficient. The central ramp allows a vertical circulation of vehicles and ease of movement with a double lane and 2 rows of parking. Aluminum panels attached to a light galvanized steel structure cover the concrete structure of the upper levels on the south and west elevations giving the building a distinctive aesthetic.
Photography: David Boyer